


Plastic manufacturing
Plastic Engineering Solutions
£25,182 projected annual savings
- 150 kWp system
- 23% projected bill reduction
- 2.8 years payback
- Installed in 2 weeks, zero downtime
For businesses
One evidence base, one tender brief and our panel of vetted installers, run end to end in your own secure tender portal.


50+
commercial projects and tenders handled
10,000+
solar panels installed through CH Group projects
£1.5m+
estimated annual energy bill savings for our clients
8 MW
of projects awarded in 2026
| Today | With CH Group |
|---|---|
| Every installer quotes on their own assumptions | One tender brief, the same assumptions for all |
| Quotes you can't compare like for like | Every proposal normalised, side by side |
| Paperwork scattered across spreadsheets, emails and PDFs | Everything live in one secure tender portal |
| You chase installers and run the process yourself | We run the whole tender for you, end to end |
| An unclear decision to take to the board | A clear, board-ready recommendation |
Throughout, you follow every step live in your own tender portal.
We run the tender end to end, and you follow every step in your own portal. It replaces the spreadsheets, email chains, messages and PDF quotes.



Better procurement doesn't remove choice. It makes choice useful.
We normalise each proposal on the same ten variables, so you compare like with like.
| Capex (direct ownership) | Asset finance (spread the cost) | PPA (funded solar) | |
|---|---|---|---|
| How it works | You fund the system and keep all the long-term savings. | Spread the cost over an agreed term. | A third party funds it. You buy the power at an agreed rate. |
| Upfront capital | Required | Not required (loan financed) | Not required |
| Ownership | You, from day one | You, now or at end of term | The funder |
| Best suited to | Available capital and a long-term ownership view | Preserving working capital while owning the asset | Larger sites, subject to suitability and funder terms |
We compare the structure as well as the system: cash flow, ownership, savings, contract term and suitability. All funding routes are subject to suitability and funder terms.
A few answers give you an indicative saving, system size and payback for your site, and a first read on how ready it is for a tender. We verify every figure with twelve months of half-hourly data before any installer quotes.
Our panel of vetted EPC partners is chosen for capability, pricing discipline and delivery standards.

Track record
Commercial discipline
Technical & delivery



Plastic manufacturing
£25,182 projected annual savings

Plant & machinery hire, Bristol
£20,075 projected annual savings
Projected figures supplied for each case study. Savings depend on each site's energy use, tariff and system.
Our fee is agreed in writing before you commit to anything. Our installer partners also pay us to develop and run tenders, and every partner bids against the same brief, so no installer can buy a better place in your comparison. The numbers behind our recommendation sit in your portal, so you can check them yourself.
No, but it is where the value is. The tender is what makes proposals comparable. If you already hold quotes, we can put them on a single basis and tell you what they actually say. That is often the fastest route to a decision.
Only the people you name. Each tender runs in a private, access-controlled workspace that search engines never see. Installers never see each other's responses or your commercial position.
Then that is the recommendation, and you will have the evidence behind it. A structured process that stops a weak project being built has done its job.
Not every EPC becomes a CH Group partner. Our vetted panel is chosen for track record, commercial discipline and safe, reliable delivery, including MCS and NICEIC accreditation and full PL, EL and PI insurance.
Businesses across the UK and Ireland, most often manufacturers and other energy-intensive sites that own or control their roof.
Often, yes. A rooftop system on a leased building needs landlord consent and a lease long enough to support the term. We check both early, before anyone prices the project.
Yes, through an export agreement. Export rates are well below your import price, so a system should be sized around your daytime demand first. The demand profile in your energy assessment settles that question.
A short call with Harry or James. We get to know your site, energy use and objectives, and show you how a structured tender would work for you.
Initial review We get to know your site, energy use and objectives.
Energy assessment We analyse your energy data and solar potential.
Structured tender Our vetted EPC partners compete for your project, and we give you a clear recommendation.
Opens Calendly in a new tab.


Prefer to talk now? Call Harry on +44 7488 893313.