Plastic manufacturing
Plastic Engineering Solutions
Lower energy costs. Uninterrupted production.
A structured comparison. A confident decision. Long-term value.

-
£25,182
projected annual savings
-
£1,338,130
25-year net savings*
-
2.8 years
payback
- Solar capacity
- 150 kWp
- Panels installed
- 300
- Installation
- 2 weeks
- Business downtime
- 0 days
The challenge
For PES, energy is a major operating cost. The plastic components manufacturer wanted to reduce that cost while advancing its sustainability ambitions, without interrupting production.
The CH Group difference
PES had already received installer proposals. CH Group broadened the options, introducing several contractors and comparing their offers alongside the existing proposals. A structured, pragmatic approach gave PES a clearer basis for choosing the right partner.
From comparison to completion
Following a site survey, PES appointed a CH Group-introduced installer for its competitive commercial offer, professional approach and experience in minor roof repairs. A contract was signed and the project moved into delivery.
* Net savings are projected over 25 years. Financial figures supplied for each case study.